Under Construction
June 2024
Lowndes County, MS

Golden Triangle I Solar + Storage

A 200 MWac project with 50 MW of battery storage for TVA is expected to be completed in 2024.

Solar capacity
200mw
homes powered
52K
co2 emissions Avoided
265K MT
Storage capacity
50mw
storage duration
200MWh
Project Overview

Golden Triangle I is part of a portfolio of projects in Mississippi, including Golden Triangle II and Optimist, with a total capacity of 550 MW plus 150 MW of battery storage. This is the largest battery storage portfolio announced in Mississippi and the largest solar portfolio under construction in the state, maintaining TVA’s leadership in clean power generation throughout the Southeast.

The three projects were developed, are being constructed and will be operated by Origis Energy, one of America’s leading renewable energy platforms. Each will deliver clean energy at competitive rates under Power Purchase Agreements (PPAs) executed between TVA and Origis. TVA will then use the power to help meet the sustainability goals of some of its large industrial customers, along with residents in Mississippi.

“TVA is a clean energy leader, and we’re working with partners, like Origis, to add solar power to our system to meet customer demand,” said Jeremy Fisher, SVP Commercial Energy Solutions with TVA. “Projects like these, ensure we can continue to provide affordable, reliable, resilient and sustainable energy to fuel the region’s economic growth.”

01

Roughly 1.5 million solar panel modules will be installed at the three sites, enough to power an estimated 126,000 homes.

02

Following the pandemic, TVA’s low-cost, clean and reliable electricity, coupled with unprecedented migration into the area, resulted in a rebound in economic growth in the region of 8% in 2021 and 3.5% in 2022.

04

Upon completion of the plants, Origis Energy Services will operate and maintain the portfolio, employing approximately 9 on-site jobs over the 35+ project life years.

02

Following the pandemic, TVA’s low-cost, clean and reliable electricity, coupled with unprecedented migration into the area, resulted in a rebound in economic growth in the region of 8% in 2021 and 3.5% in 2022.

03

RES is providing construction services to Origis for the portfolio, employing an estimated 300 people over the course of the three projects.

04

Upon completion of the plants, Origis Energy Services will operate and maintain the portfolio, employing approximately 9 on-site jobs over the 35+ project life years.

05

The utility-scale battery storage for each site is provided by Mitsubishi Power Americas.

03

RES is providing construction services to Origis for the portfolio, employing an estimated 300 people over the course of the three projects.

05

The utility-scale battery storage for each site is provided by Mitsubishi Power Americas.

06

Estimated economic benefits from the three projects include $106 million in near-term construction and hiring gains to the area. Over the life of the solar plants, they will provide another $145 million in estimated regional economic benefits.

ECONOMIC IMPORTANCE

“Lowndes County is happy to partner with TVA and Origis to bring this increased capability to the TVA footprint. The clean energy benefits for the region and the economic development that result from cooperation on mutually beneficial projects like this continue to strengthen our already solid partnerships with both industry and TVA.” – Trip Hairston, Lowndes County Supervisor District 2

“Our office has worked continually with both TVA and Origis through all phases of this project. These investments provide a unique diversification to our tax base and upon completion provide additional tax revenue to the counties and the schools.” – Joe Max Higgins, CEO at the Golden Triangle Development Link

ENERGY IMPORTANCE

Golden Triangle I will deliver clean energy and grid resiliency at competitive rates under Power Purchase Agreements executed between Origis Energy and the TVA.